Inspection standards, codes and regulations followed:
Preferably, CCU, lifting points and lifting set are to be inspected at the same time (please refer to sections 'NDT' and 'lifting gears').
All Crane must be inspected annually as per OSHA standards
According to the American National Standards Institute (ANSI), there are four categories for overhead crane inspections:
Routine inspections can help identify potential problems and address them before a costly or irreversible incident occurs.
Proof load tests can be performed on various pieces of lifting and rigging equipment, and are designed to ensure that the piece of machinery being tested is able to lift the design load without failure or deformation (yeliding).
Typically performed as a static pull test, the proof load test is considered a complementary test that provides structural and safety assurances.
Proof load tests are generally carried out on the following equipment:
Sling, chain sling, shackles, hooks, master links, forklift extensions, pallet bars, pallet forks, pallet racks, personal transfer basket, body harness.
The list above is a summary of the most common Lifting Gear used during onshore and offshore Oil & Gas operations. GUC Ltd can provide inspections on various other items upon request.
Periodic inspection of Lifting Gear is essential. Lifting cargo and equipment is one of the most critical operations during a whole project. Many industry injuries - both light and severe - occur during lifting operations.
It has been proven that suitable and appropriate periodic inspections by professional third party inspection providers like GUC Ltd can lower the risk of these incidents and injuries.